09 · Planned Maintenance

Planned Preventative Maintenance for Commercial Mechanical Services

  • By Flair Facilities Ltd engineering team
  • Published
  • Updated
Quick answer

Planned preventative maintenance (PPM) is a scheduled programme of inspections, servicing and tests carried out before equipment fails. A good mechanical PPM programme starts with an accurate asset register, assigns each asset tasks and frequencies based on statutory requirements, manufacturer guidance and industry standards such as SFG20, and is then adjusted for how critical each asset is to the building's operation.

Why does mechanical PPM matter?

Mechanical failures are rarely random. Pumps give warning through noise and vibration, filters load gradually, and water quality degrades over months. PPM catches these trends while they are still cheap to fix, helps demonstrate legal compliance, protects warranties and gives a predictable budget instead of emergency spend.

How do you build a PPM programme?

1. Build an accurate asset register

List every maintainable asset with location, make, model, serial number, capacity, age and what it serves. An incomplete register is the most common reason PPM programmes miss things.

2. Classify each task

CategoryMeaningExample
StatutoryRequired by lawGas safety checks, pressure system examinations, F-gas leak checks
MandatoryRequired to maintain warranty, insurance or safetyManufacturer-required boiler servicing
OptimalGood practice for reliability and efficiencyPump vibration checks, coil cleaning

3. Assign frequencies

Start from SFG20 or equivalent task schedules and manufacturer instructions, then adjust non-statutory frequencies for criticality. A pump serving a hospital ward warrants a different regime from one serving a storage area.

4. Plan resources and access

Group tasks by location and season. Heating plant is best serviced before winter, cooling plant before summer. In occupied offices, intrusive work may need to be scheduled out of hours.

5. Record, review and improve

Capture findings, readings and defects, not just completion. Review breakdown history each year to see whether frequencies or tasks need changing.

Example mechanical PPM schedule

The table below illustrates typical starting points. Always confirm frequencies against your asset’s documentation, your insurer’s requirements and a current task library.

AssetTypical frequencyExample tasks
Gas-fired boilersAnnually (minimum)Service, combustion analysis, safety checks
Circulation pumps6–12 monthsNoise, vibration, seals, duty/standby changeover
Pressurisation unit and vesselsAnnuallyPressure settings, vessel pre-charge, pump operation
AHUsQuarterly to annuallyFilters, belts, fans, dampers, coils, drains
Fan coil unitsAnnuallyFilters, condensate drains, fans, valves
Booster setsAnnuallyPressure settings, vessels, changeover, controls
BMSAnnuallySensor calibration, back-ups, alarm review
Water treatmentMonthly to quarterlySampling and dosing checks

A fuller, printable version is in our mechanical PPM checklist.

Safety: PPM tasks on gas, electrical, pressurised and rotating plant must be carried out by competent, appropriately qualified people with safe isolation procedures. A checklist is not permission for untrained staff to carry out engineering tasks.

How do you judge whether a PPM contract is working?

  • Completion rates against the schedule, reported monthly
  • Reactive call-outs falling over time
  • Defects identified and closed out, with costs approved promptly
  • Certificates and records uploaded and easy to find
  • Asset register kept up to date as equipment is replaced

When should you review your PPM arrangements?

Review when you take over a building, after a major failure, when plant is replaced, when building use changes, and at contract renewal. An independent review of the asset register and task list is often the quickest way to find gaps.

flairfacilities.co.uk

More BMS expertise from Flair Facilities

Frequently asked questions

What is the difference between PPM and reactive maintenance?

PPM is scheduled in advance to prevent failure and maintain compliance. Reactive maintenance responds to breakdowns after they occur. Most buildings need both, but a strong PPM programme reduces the frequency and cost of reactive call-outs.

What is SFG20?

SFG20 is the industry standard library of maintenance tasks and frequencies for building engineering services in the UK, published by BESA. It distinguishes statutory, mandatory and optimal tasks and is widely used to specify maintenance contracts.

How often should HVAC equipment be maintained?

Frequencies vary by asset type and criticality. Filters may be checked monthly, fan coil units serviced annually, and chillers serviced quarterly or biannually. Statutory items such as gas safety checks, F-gas leak checks and pressure system examinations have their own required intervals.

Should PPM frequencies ever be reduced?

Non-statutory tasks can be adjusted using a risk-based approach, considering asset condition, history and criticality. Statutory and mandatory tasks must not be reduced below the legal or manufacturer requirement.

UK technical references

Primary sources and industry guidance relevant to this topic. Always check you are working to the current edition.

  1. SFG20 maintenance standard — BESA / SFG20
  2. CIBSE Guide M: Maintenance engineering and management (via the CIBSE knowledge portal) — Chartered Institution of Building Services Engineers
  3. Provision and Use of Work Equipment Regulations (PUWER) — Health and Safety Executive
  4. Building Engineering Services Association — BESA

This guide is general technical information for commercial property teams in the UK. It does not replace a site-specific assessment. Gas work must be carried out by a Gas Safe registered engineer, and work on electrical, pressurised or combustion equipment by competent, appropriately qualified people.

BMS London at a glance