Signs your BMS needs upgrading
- Spare parts for controllers are hard to find or no longer made
- The front-end runs on unsupported software or a single old PC
- Only one contractor can work on the system
- Plant from different eras runs on separate, unconnected controls
- Engineers spend visits working around limitations rather than fixing faults
- You cannot get the energy or trend data you need
Upgrade options
| Approach | What changes | Best when |
|---|---|---|
| Targeted replacement | Failed or obsolete controllers only | Most of the system is sound |
| Front-end upgrade | Supervisor, graphics, remote access | Controllers are current but the interface is not |
| Full migration | Controllers, front-end and network | The system is end-of-life throughout |
| Layered integration | Adds controls to existing plant | Plant is staying but needs central control |
We explain the cost and risk of each approach for your building, rather than defaulting to the biggest job.
Integrating separate systems
Many London buildings have accumulated controls over decades: a boiler sequencer from one refurbishment, AHU controls from another, standalone chiller panels and lighting on its own system. Smart building integration connects them over open protocols so they report to one front-end, share schedules and interlocks, and record data in one place. See the BMS and building controls guide for how the layers fit together.
Safety: Changeover of live controls is planned with the site, with safe isolation and temporary arrangements so that frost protection, fire interlocks and other safety functions remain in place throughout.
After the upgrade
An upgraded system needs maintaining like any other. Our BMS servicing and maintenance keeps it backed up and calibrated, and controls optimisation makes sure the new capability is actually used.