Where BMS energy is typically wasted
| Issue | What happens | Optimisation step |
|---|---|---|
| Out-of-hours running | Plant runs evenings, weekends and holidays | Schedules, holiday calendars, optimum stop |
| Early starts | Heating starts hours before it needs to | Optimum start based on actual warm-up |
| Heating and cooling together | Fan coils or AHUs fight each other | Wider deadbands, coordinated supply temperatures |
| High flow temperatures | Condensing boilers cannot condense efficiently | Weather compensation |
| Forgotten overrides | Pumps and fans forced on permanently | Override audit and removal |
| Hunting loops | Valves swing open and closed, plant cycles | Loop tuning |
Evidence first
Every recommendation is based on data from your building: trend logs, schedules, meters and alarm history. That gives a clear baseline, makes the changes easy to justify, and lets you see the effect afterwards. Our guide to BMS alarm management shows how the same approach applies to alarms.
Safety: Optimisation never reduces frost protection, Legionella control temperatures, fire interlocks or other safety functions. Changes affecting hot water temperatures or ventilation rates are checked against the building’s water safety plan and ventilation requirements.
Keeping the gains
Optimised settings drift if nobody is watching, a problem known as BMS energy drift. We recommend pairing optimisation with planned BMS servicing and maintenance, so schedules, setpoints and overrides are checked on every visit. If optimisation reveals faulty devices, our BMS repair team can put them right.