BMS Controls Optimisation in London

Make your existing BMS work harder: plant that runs only when needed, heating and cooling that stop fighting, and alarms that mean something.

  • Rising energy bills with no change in use
  • Buildings that changed occupancy patterns
  • Persistent hot and cold complaints
  • Preparing for energy reporting or MEES reviews
Chart of a room temperature line inside a green deadband between heating and cooling setpoints, with occupied hours from 06:00 to 18:00 marked Original chart. An orange cooling setpoint line sits above a teal heating setpoint line. The band between them is labelled deadband: neither heating nor cooling. Vertical dashed lines mark 06:00 and 18:00. SETPOINTS · DEADBAND · SCHEDULE deadband: neither heating nor cooling cooling above heating below 06:0018:00 occupied hours
In short

BMS optimisation is the process of tuning an existing building management system to the way the building is actually used. It covers time schedules, setpoints and deadbands, optimum start and stop, weather compensation, removal of forgotten overrides, control loop tuning, sensor accuracy and alarm priorities. Because it changes settings rather than plant, it is usually one of the lowest-cost ways to reduce energy use and comfort complaints.

What's included

Controls optimisation: scope of work

  • 01

    Schedules and occupancy

    Time programmes, holiday calendars and optimum start and stop matched to real occupancy.

  • 02

    Setpoints and deadbands

    Sensible setpoints and wide enough deadbands so heating and cooling do not run together.

  • 03

    Weather compensation

    Heating flow temperatures linked to outside conditions, helping condensing boilers and heat pumps run efficiently.

  • 04

    Override clean-up

    Long-standing hand and software overrides found, justified or removed, and documented.

  • 05

    Loop tuning

    Unstable control loops that hunt or cycle plant tuned for steady control.

  • 06

    Alarm review

    Alarm priorities, limits, delays and routing reviewed so critical events are seen.

Where BMS energy is typically wasted

IssueWhat happensOptimisation step
Out-of-hours runningPlant runs evenings, weekends and holidaysSchedules, holiday calendars, optimum stop
Early startsHeating starts hours before it needs toOptimum start based on actual warm-up
Heating and cooling togetherFan coils or AHUs fight each otherWider deadbands, coordinated supply temperatures
High flow temperaturesCondensing boilers cannot condense efficientlyWeather compensation
Forgotten overridesPumps and fans forced on permanentlyOverride audit and removal
Hunting loopsValves swing open and closed, plant cyclesLoop tuning

Evidence first

Every recommendation is based on data from your building: trend logs, schedules, meters and alarm history. That gives a clear baseline, makes the changes easy to justify, and lets you see the effect afterwards. Our guide to BMS alarm management shows how the same approach applies to alarms.

Safety: Optimisation never reduces frost protection, Legionella control temperatures, fire interlocks or other safety functions. Changes affecting hot water temperatures or ventilation rates are checked against the building’s water safety plan and ventilation requirements.

Keeping the gains

Optimised settings drift if nobody is watching, a problem known as BMS energy drift. We recommend pairing optimisation with planned BMS servicing and maintenance, so schedules, setpoints and overrides are checked on every visit. If optimisation reveals faulty devices, our BMS repair team can put them right.

How it works

Our process

  1. Step 1

    Baseline

    Trend data, meters and schedules reviewed to see how the building behaves today.

  2. Step 2

    Findings

    Opportunities listed with expected effect on comfort, energy and plant wear.

  3. Step 3

    Implement

    Agreed changes made in stages, each recorded in a change log.

  4. Step 4

    Verify

    Trends compared before and after, and settings adjusted if needed.

flairfacilities.co.uk

More on controls optimisation from Flair Facilities

Controls optimisation: questions

How much energy will optimisation save?

It depends entirely on how the system is set up today. We baseline current operation from trend and meter data first, so savings can be measured against real figures rather than estimated.

Will occupants notice the changes?

The aim is fewer complaints, not more. Changes are made in stages and monitored, and comfort conditions are kept within agreed limits throughout.

Do we need new equipment?

Usually not. Optimisation works mostly with settings and logic in the existing BMS. Where a faulty sensor or actuator prevents good control, we will identify it and quote separately.

How do you stop settings drifting back?

Changes are recorded in a change log, access levels are reviewed so ad-hoc changes are controlled, and settings are checked on planned maintenance visits.

Can optimisation help with heat pump readiness?

Yes. Lowering heating flow temperatures through weather compensation and better control is often the first step in understanding whether a building can move to heat pumps.

UK technical references

Primary sources and industry guidance relevant to this topic. Always check you are working to the current edition.

  1. Non-domestic private rented property: minimum energy efficiency standard — GOV.UK
  2. Temperature in the workplace — Health and Safety Executive
  3. CIBSE knowledge portal (Guide H: Building control systems) — Chartered Institution of Building Services Engineers

BMS London at a glance