New building management systems designed, built and commissioned for commercial buildings across Greater London, from a single plant room to a multi-system site.

  • New plant rooms and plant replacements
  • Buildings with no BMS or isolated time clocks
  • Fit-outs and refurbishments
  • Multi-system sites needing one front-end
Diagram of a building management system in four layers: a supervisor at the top, a BACnet network, four controllers for boilers, AHUs, chillers and pumps, and field sensors and actuators below Original line drawing. A supervisor box connects by an orange network line to four controllers. Each controller has dashed signal lines down to a round sensor and a square actuator. BMS ARCHITECTURE · 4 LAYERS Supervisor / web front-end BACnet/IP ControllerBoilers ControllerAHUs ControllerChillers ControllerPumps FIELD DEVICES · SENSORS ● ACTUATORS ■
In short

BMS installation covers the full process of putting a building management system into a commercial building: surveying the plant, writing the control strategy, building control panels, installing sensors and actuators, wiring, programming controllers and commissioning every point. We design systems on open protocols so the building is not locked into one supplier, and hand over full documentation so any competent controls engineer can maintain it.

What's included

BMS installation: scope of work

  • 01

    Survey and control strategy

    We survey the plant and building use, then write a control strategy describing how every system should run, interlock and alarm.

  • 02

    Custom control panels

    Panels designed and built for the site, with logically mapped, numbered and compliant wiring that matches the drawings.

  • 03

    Field devices

    Temperature, pressure, humidity and CO2 sensors, valve and damper actuators, and current switches, installed so they read what they are meant to measure.

  • 04

    Open-protocol integration

    Controllers and plant connected over open protocols such as BACnet and Modbus, so boilers, HVAC and other systems report to one front-end.

  • 05

    Programming and graphics

    Control logic, schedules, alarms, trend logs and operator graphics configured for the way the building is actually used.

  • 06

    Commissioning and handover

    Every point tested end to end, with points list, control strategy, as-built drawings, back-ups and operator training at handover.

What a well-installed BMS should give you

A building management system is only as good as its design and installation. Done well, it runs plant only when it is needed, keeps every space at the right conditions, raises meaningful alarms and records the data engineers need to diagnose problems. Done badly, it becomes a source of nuisance alarms, wasted energy and faults nobody can trace.

Our installations are built around three principles:

  • Open protocols. Systems designed on open standards, so you are not tied to one supplier for future service or expansion.
  • Readable engineering. Panels and wiring logically mapped and labelled, with drawings that match what is in the cabinet.
  • Complete handover. You own the control strategy, points list, drawings and back-ups.

Designing the control strategy

The control strategy is the written description of how the building should behave: when each system runs, which setpoints it holds, how plant is sequenced, which interlocks protect it and what raises an alarm. We write it before anything is built, agree it with you, and commission against it. It is also the document your maintenance contractor will rely on for years.

Strategy elementExamples
Time and occupancyTime schedules, holiday calendars, optimum start and stop
Heating and hot waterBoiler sequencing, weather compensation, calorifier control
Ventilation and coolingAHU supply temperature, fresh air control, chiller enable
ProtectionFrost protection, fire alarm interlocks, high-limit and pressure trips
Alarms and dataAlarm priorities and routing, trend logs, energy metering

Sensors that read what they should

Many BMS problems trace back to installation detail: a pipe sensor not fully seated in its pocket, an outside air sensor in direct sun, or a room sensor next to a printer. We install and insulate sensor pockets so the controller reads fluid temperature rather than room air, and position room and outside sensors to represent the conditions that matter. See our guide to BMS temperature sensor faults for why this matters.

Safety: BMS panels contain mains voltages and control plant that can start automatically. Installation, panel work and changes to safety interlocks are carried out by competent engineers with safe isolation procedures, and frost, fire and high-limit protection is never bypassed to complete commissioning.

Integrating existing plant

New controls rarely arrive in a building with no plant. Boilers, chillers, AHUs, pumps and pressurisation units can be integrated over BACnet or Modbus where they support it, or through hard-wired signals where they do not. Where existing plant is staying, BMS integration is often the most cost-effective route to central control. If you already have a BMS that needs replacing, see BMS upgrades and integration.

After installation

A new BMS needs planned maintenance like any other building service: back-ups, sensor calibration, alarm review and checks of interlocks. We offer BMS servicing and maintenance for systems we install and for systems installed by others.

How it works

Our process

  1. Step 1

    Site survey

    Plant, existing controls, cabling routes, access and occupancy are recorded.

  2. Step 2

    Design and proposal

    Control strategy, points list, panel design and a clear scope with programme.

  3. Step 3

    Build and install

    Panels built, devices installed and cabling run, phased around occupied areas where needed.

  4. Step 4

    Commission and hand over

    Point-to-point testing, functional testing, documentation and training.

flairfacilities.co.uk

More on bms installation from Flair Facilities

BMS installation: questions

How long does a BMS installation take?

It depends on the size of the building, the number of systems and points, and access. A single plant room can be a matter of weeks; a multi-storey building with several plant areas is planned in phases. We give a programme with every proposal after surveying the site.

Which BMS platforms do you install?

We design open-protocol systems, including platforms such as Trend, Tridium and Honeywell, and select equipment to suit the building, existing infrastructure and the client's preference. The aim is a system any competent controls engineer can support.

Can a new BMS be installed while the building is occupied?

Yes. Most London commercial buildings stay occupied, so installation is phased: plant is changed over in planned windows, often out of hours, with temporary control arrangements where needed to keep heating, cooling and ventilation running.

What documentation will we receive?

A control strategy, points list, as-built panel and wiring drawings, network details, configuration back-ups, operator graphics and commissioning records. These belong to you and make future maintenance straightforward.

Can you connect our boilers and HVAC to the new BMS?

In most cases, yes. Modern plant typically offers BACnet or Modbus interfaces, and older plant can usually be monitored and controlled through hard-wired inputs and outputs.

UK technical references

Primary sources and industry guidance relevant to this topic. Always check you are working to the current edition.

  1. Approved Document L: Conservation of fuel and power — GOV.UK
  2. Electricity at Work Regulations 1989 — legislation.gov.uk
  3. Construction (Design and Management) Regulations 2015 — Health and Safety Executive